PIPELINES

Seahawk

Twenty-one-mile 12-inch pipeline originating in Point Comfort Texas and terminating near Edna, Texas:

  • 100,000 BPD capacity to transport crude/condensate
  • Pipeline will provide a direct connection to the Seahawk Terminal
  • Seahawk marine terminal offers shippers a less congested Port option with utilization rate < 35%
  • Matagorda Bay Pilots confirm to NST, ALL (4) classes of Jones Act vessels to transit into Point Comfort.
  • The maximum ship size allowable to transit the Matagorda Ship Channel is 229m x 32.2m (751’x 106’). Larger vessels are evaluated on a case by case basis for example, the Arco Sag River with dimensions of 246m X 32.2m (809’ x 106’) was escorted into Port by MBP.
Videos:
Corporate Headquarters
10077 Grogans Mill Road
Suite 530
The Woodlands, TX 77380
(713) 277-7000

Commercial: Steve Ferro
832-567-3209
sferro@northstarmidstream.com

Engineering: Chip Lang
(713) 702-6701
clang@northstarmidstream.com

Operations: Tom Sullivan
(732) 710-7226
tsullivan@northstarmidstream.com

Point Comfort: Steven Svetlik
(361) 935-1185
ssvetlik@northstarmidstream.com